overview
overview
PEARL GARDENS Located at VGP Babu Nagar 1st street Extn.Medavakkam, Chennai. which is just 500 Mts. from Medavakkam – Velachery Road. Comprising of 20 Life Style apartments in Four block – Stilt + 2 floors – 2 BHK ranging from 836 to 989 Sq. Ft.
Area Statement
AREA STATEMENT / FLAT DETAILS
Pearl Gardens @ Medavakkam, Chennai
Plot | Floor | Flat No | Rooms | Main Door Entry | UDS Sq. Ft. |
Flat Area Sq. Ft. |
Status |
---|---|---|---|---|---|---|---|
A1 | FIRST | FF-01 | 2 BHK | East | 480.50 | 919 | B |
FF-02 | 2 BHK | South | 437.50 | 836 | B | ||
FF-03 | 2 BHK | West | 480.50 | 919 | B | ||
SECOND | SF-01 | 2 BHK | East | 480.50 | 919 | B | |
SF-02 | 2 BHK | South | 437.50 | 836 | A | ||
SF-03 | 2 BHK | West | 480.50 | 919 | B | ||
2797.00 | 5348.00 | ||||||
A2 | FIRST | FF-01 | 2 BHK | East | 477.00 | 914 | B |
FF-02 | 2 BHK | South | 444.50 | 852 | B | ||
FF-03 | 2 BHK | West | 477.00 | 914 | B | ||
SECOND | SF-01 | 2 BHK | East | 477.00 | 914 | B | |
SF-02 | 2 BHK | South | 444.50 | 852 | B | ||
SF-03 | 2 BHK | West | 477.00 | 914 | B | ||
2797.00 | 5360.00 | ||||||
A3 | FIRST | FF-01 | 2 BHK | North | 516.00 | 989 | B |
FF-02 | 2 BHK | North | 516.00 | 989 | B | ||
SECOND | SF-01 | 2 BHK | North | 516.00 | 989 | B | |
SF-02 | 2 BHK | North | 516.00 | 989 | B | ||
2064.00 | 3956.00 | ||||||
A4 | FIRST | FF-01 | 2 BHK | North | 516.00 | 989 | B |
FF-02 | 2 BHK | North | 516.00 | 989 | B | ||
SECOND | SF-01 | 2 BHK | North | 516.00 | 989 | B | |
SF-02 | 2 BHK | North | 516.00 | 989 | B | ||
2064.00 | 3956.00 | ||||||
Site Address: Ganesan Nagar, VGP Babu Nagar 1st Street Extn., Medavakkam, Chennai. |
Contact : +91 955 1888 777, +91 984 1234 678 |
STATUS : A – AVAILABLE; B – BOOKED
floor plan
specification
specification
- STRUCTURE
- R.C.C Framed structure with RCC Columns, Beams, Slab Etc.,.
- Brick Masonry walls with Plastering in CM.
- CCP in Stilt floor, with Two or more Floors.
- EARTH QUAKE resistant design as per STRUCTURAL CONSULTANT.
- COLOURS and DESIGN are as per ARCHITECT’s approval.
- JOINERIES
DOORS
WINDOWS
VENTILATORS
- MAIN ENTRANCE door shall be provided with First class TEAK WOOD, frames and shutter switch “GODREJ Night Latch” or MORTISE lock, brass hinges and Lacquered brass handles and Eye piece will be provided.
- ALL OTHER DOORS shall be provided with TEAK WOOD frames and 12mm thick water proof inserts or solid core flush door shutters, OST or skin door.
- BATHROOM DOORS shall be provided with laminated / Chemical Painted flush doors. Door fittings will be provided with Anodized Aluminum Fittings.
- WINDOW frames and shutters shall be of with UPVC / Teak wood framed, glazed shutters with MS grills.
- VENTILATORS shall be provided UPVC / Teak wood framed, Glazed louvers with MS grills.
- FLOORING
LIVING
DINING
BED ROOMS
CAR PARKING
- Living / Drawing, Dining, Kitchen and Other Bed Rooms flooring shall be provided with 2’0” x 2’0” Vitrified tiles of standard brands ( Basic cost of tile at Rs. 42.00 / Sq. Ft. )
- Utility and Other Balcony Flooring shall be provided with 1’0” X 1’0” Ceramic tiles ( Basic cost of tile at Rs. 35.00 / Sq. Ft. )
- Car Parking Flooring - DUROCREET or Equivalent brand / Rubber moulded Interlocking floor tiles ( Basic cost of tile at Rs. 35.00 / Sq. Ft. )
- KITCHEN
FLOORING
PLATFORM
SINK
LOFT
SHELVES
- Kitchen floorings shall be provided with 2’0” x 2’0” Vitrified tiles of standard brands ( Basic cost of tile at Rs. 42.00 / Sq. Ft.).
- Kitchen platform shall be of high grade polished Black GRANITE top (Basic cost of Granite at Rs. 120.00 / Sq. Ft. ).
- Dado up to 2’ 0” height above the platform ( Basic cost of tile at Rs. 30.00 / Sq. Ft. ).
- Stainless Steel kitchen sink shall be provided with out drain board.
- LOFT & SHELVES shall be provided as per drawings.
- Suitable openings for exhaust fans will be provided.
- Separate pipe lines to sink shall be provided for Bore & sump water
- TOILETS
FLOORING
WALLS
- Anti skid Ceramic tiles flooring, ( Basic cost of tile Rs. 35.00 / Sq. Ft. )
- Ceramic tile dado for about 7’ 0” height from the floor. ( Basic cost of tile at Rs. 32.00 / Sq. Ft.)
- Suitable openings for exhaust fans shall be provided.
- Water proofing to all toilets by Brick Bat Coba.
- STAIR CASE
FLOORING
RAILING
- Steps and landing will provided with Granite ( Basic cost of Granite at Rs. 100.00 / Sq. Ft.)
- Hand railing will be provided with Stainless steel material.
- SANITARY WARES & FIXTURES
EWC
IWC
WASH BASIN
- EWC, Wash basin shall be provided with PARRYWARE / HINDWARE or Eq. brand. For attached bed room toilets
- IWC shall be provided with PARRYWARE / HINDWARE or Eq. brand for common toilets
- Wash basin shall be provided with PARRYWARE / HINDWARE or Eq. brand either in Dining or in common toilet
- Low level flushing cisterns of PVC or FRP fittings, plastic seat cover for EWC, Deluxe CP brass fittings and other suitable fixture.
- PLUMBING
SUMP
OHT
SEPTIC TANK
BATH ROOMS
KITCHEN SINK
PARKING AREA
- One SUMP of adequate capacity individually for receiving Metro / Panchayath water as and when CMWSSB / PANCHAYATH water supply becomes available to the complex.
- One OVER HEAD TANK of adequate capacity shall be provided at the terrace of the building (to serve all the Flats) with Two compartments for pumping water from captive source ( bore well ) and water from the ground sump.
- SEPTIC TANK of adequate capacity shall be Provided
- A Tap in the kitchen for Metro / Panchayath water supply from over head tank. Taps shall be provided to supply Ground water (bore water) / Sump water to bath, toilet and kitchen through over head tank(s).
- 2 way Tap connections shall be provided in bathrooms with hygiene faucet with Overhead shower & Hot and cold water provision.
- Concealed plumbing arrangements, with CPVC pipe line of slow guard make for hot water pipe line.
- For All Internal plumbing lines CPVC pipes and for External plumbing lines UPVC pipes are used
- All PLUMBING fittings shall be provided with HAVELLES or Eq. brand.
- ELECTRICAL
- 3 Phase Electric supply connection with change over facility
- Concealed copper wiring,
- Provision for Inverter. McB / ELCB (Earth Leak circuit breaker) as per the choice of the Builder.
- Provision of ELECTRICAL points as listed in table below…
- PAINTING
INTERNAL
EXTERNAL
DOORS
WINDOWS
GRILLS
- All INTERNAL WALLS & CEILING shall be applied with Acrylic Putty to have smooth surface and finally finished with one coat of acrylic primer and 2 coats of EMULSION paint.
- The EXTERNAL WALLS of the apartment / building shall be initially applied with 2 coats of White cement and finally finished with 2 coats of weather proof EXTERIOR EMULSION.
- Doors other than entrance door & Windows with enamel paint.
- Entrance / Main door with varnish (sealer finish / Melamine finish).
- M.S. Grills with two coats of enamel paint.
( NOTE: All COLOURS mentioned above are as per the PROMOTERS choice only )
- WARDROBES
All Wardrobes / Cupboards, Showcases & Shelves in all the rooms shall be provided with both sides polished Black Coloured Cudappa slabs to a maximum of 45 Sq. Ft. in 2BHK Flats & 60 Sq. Ft. in 3BHK Flats ( If any Additional quantity required beyond the provision will be charged Extra)
- COMPOUND WALL
EWC
IWC
WASH BASIN
- Compound wall be provided along the boundaries of the premises ( Only, when the premises is open from the other side ) with M.S. gate as per the Design & Drawings.
- Paved driveway / Ramp will be provided as per the drawings
- SPECIAL AMENITIES
- Hard & Soft Landscaping will be provided ( If space available for )
- BUILDING Elevation is as per the ARCHITECTS design.
- Building Name shall be provided in Metal letters.
- FLAT OWNERS Name Plate will be provided at the entrance of the APT.
- Separate EB Meters for all Flats in the Main board, sub main Distribution board (DB box) in each flat for quick isolation of supply and Separate common EB Meter for common service .
- Water Proofing to all toilets by brick bat coba.
- Water storages shall be water proofed.
- Covered parking space for vehicles with common water tap.
- Rain water harvesting provision will be provided.
- PEST control treatment in THREE stages.
- Safety / Coverings will be provided for MOTORS.
- Common wash basin in terrace.
- Fixed supports for drying clothes in terrace shall be provided.
- Weathering course shall be provided with THERMATEK branded, heat resistant terrace tiles.
- PROVISION OF ELECTRICAL POINTS
ENTRANCE
- One Bell point and One Light point ( 2 way).
DRAWING
- One TV point, One Telephone point, Two Light points in walls,
- One Fan point, Provision for hanging chandelier electrical point.
- Three 5 A pin points,
DINING
- Two light points in wall, One Fan point.
- One 15 A for Fridge, One 5 A pin point at suitable places.
- One light point & one 5 A Pin point over dining wash basin.
MASTER BED ROOM
- Two Light points in wall, Fan Points at suitable location. ( Fan and light points will be of 2-way)
- Two 5 A pin points, One 20 A point for A/C,
- One TV point and One Telephone point.
OTHER BED ROOMS
- Two Light points in wall, One Fan points at suitable location. Fan and light points will be of 2-way.
- Two 5 A pin points, One 20 A point for A/C,
- One Telephone point.
KITCHEN
- One Light point in wall, One Fan & exhaust fan points.
- Two 5 A pin point for Mixer & Grinder.
- Two 15 A point for Aqua guard & Micro oven,
ATTACHED TOILETS
- One Light point,
- One 5 A pin point for Exhaust fan, One 15 A point for Geyser.
COMMON TOILET & OUTSIDE WASH BASIN
- One Light point,
- One 5 A pin point for Exhaust fan, One 15 A point for Geyser.
SERVICE AREA
- One Light point.
- One 15 A point for Washing machine.
COMMON POINTS
- Common light point in stairs & terrace,
- Two numbers in compound wall,
- One point for Pump/Motor sets
SWITCHES & WIRES
- All switches shall be of modular type of MK / Legrand or Eq. brand.
- ALL Electrical wire shall be of FINOLEX Make.
- NOTE:
- Any Additions or Alterations required over the above Provisions shall be provided at EXTRA COST.
- All the FURNITURE’S & FITTINGS shown in the Architects drawing are tentative Figs only ( Which shows the place of Provision ), Which does not come under the scope of the BUILDER, if required.
- All the MEASUREMENTS shown in the architects drawings are indicative only & subjected to change.
- MAINTENANCE PERIOD for the said APT is SIX MONTHS only from the date of handing over of APT.
- EB Meters & EB cards will be provided by the TNEB as per their norms. If any delay occurs for the same, Builder will not be responsible in any manner.
- All the TAXES are applicable as per State & Central Govt.
- Abbreviations Used
APT APARTMENT CCP COVERED CAR PARKING BHK BED ROOM, HALL, KITCHEN UDS UN DIVIDED SHARE (OF LAND) RCC REINFORCED CEMENT CONCRETE CM CEMENT MORTER M.S MILD STEEL CP FITTINGS CHROMIUM PLATED FITTINGS – SANITARY CPVC PIPES CHLORINATED POLY VINYL CHLORIDE PIPES UPVC PIPES UNPLASTICIZED POLY VINYL CHLORIDE PIPES S.W.R PIPES SOIL, WASTE & RAIN WATER PIPES FRP FIBRE REINFORCED PLASTIC FITTINGS PVC POLY VINYL CHLORIDE EWC EUROPEAN WATER CLOSSET IWC INDIAN WATER CLOSSET ELCB EARTH LEAK CIRCUIT BREAKER MCB MINIATURE CIRCUIT BREAKER A AMPS CMDA CHENNAI METROPOLITON DEVELOPMENT AUTHORITY CMWSSB CHENNAI METROPOLITAN WATER & SEWERAGE BOARD
Building Views
payment schedule
payment schedule
S.No. | Stages of work | Percentage |
---|---|---|
1. | While entering into Agreement | 20% |
2. | While Registration of UDS of Land / Plot | 30% |
3. | When Foundation work commenced | 10% |
4. | When RCC roof slab of Stilt Floor / GF of house is laid | 10% |
5. | When RCC roof slab of respective Floor is laid | 10% |
6. | When Brick Work in respective Flat / House is commenced | 10% |
7. | When Painting Work in respective Flat / house is commenced | 5% |
8. | When flooring in respective Flat / house is commenced | 5% |
Location
Location
Address | PEARL GARDENS Ganesan Nagar, VGP Babu Nagar 1st Street Extn., Medavakkam, Chennai-100, TamilNadu, India. |
Phone | 044-22770058 |
Mobile | +91-955 1888 777, +91 984 1234 678 |
Brochure Download
Brochure Download
Content will be updated shortly